In the context of MACS activities as Technical Advisor to the Green for Growth Fund (GGF), MACS implemented a site inspection mission for GGF funded Solar PV Project. As the Solar PVs are installed at a previous mining location, previous rainfalls have led to ground erosion of the project site. The MACS engineer went on-site to assess implemented measures preventing further ground erosion and ensuring the long-term stability of the installed PV panels.
